Building Specs

Building Specs

ACREAGE: 87.84 Acres
MUNICIPALITY: Worcester Township
ZONING: LI – Limited Industrial
YEAR BUILT: 1989, build-to-suit for Ford Motor Company’s electronic components division
GROSS BUILDING AREA: 675,000 SF
LOADING
DOCK HIGH LOADING: 15 existing docks equipped with dock shelter, dock locks, and dock levelers
DRIVE IN LOADING: Two (2) existing
BUILDING C CLEAR HEIGHT: 23’6”
BUILDING D CLEAR HEIGHT: 20’
BUILDING E CLEAR HEIGHT: 21’
OFFICE: 8’6”
BAY SIZE: 40’ x 40’
ROOF: TPO – new in 2014
FLOOR LOADING: 6” slab of 4,000 psi reinforced concrete on 6 mil. vapor barrier with a capacity of 400 lbs per square foot
POWER: Dual power service at 34,500 volts, supplied by PECO Energy from its North Wales and Perkiomen substations
TELECOM: 600 pair copper cable and 12 strand fiber optic cable tied back to Centerpoint Service Center with potential for SONET ring
GAS: 6” main on Morris Road at a pressure of 10 psi provided by UGI
WATER: North Wales Water Authority
SEWER: Upper Gwynedd Township Authority
HVAC: Chilled water system; the entire manufacturing area is temperature and humidity controlled, a variable air volume box diffuser and temperature sensor are provided for every 40’ x 40’ bay
HEATING: Central boiler
VENTILATION: Roof top air handling units
LIFE SAFETY: Grinnell wet sprinkler system throughout supported by two (2) 500,000 gallon water tanks
LIGHTING: Four (4), 6-tube T-8 fluorescent light fixtures per bay in the manufacturing areas and 8 cell parabolic fixtures in the office areas
PARKING: 1,685 surface parking spaces
Click here to download the Building Specs